Reliable maintenance planning, estimating, and scheduling / (Record no. 45972)

MARC details
000 -LEADER
fixed length control field 04483nam a22003977a 4500
003 - CONTROL NUMBER IDENTIFIER
control field SNU
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20160511001748.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 160413b xxu||||| |||| 00| 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9780123970428
028 ## - Distributer Name & Address
Distributor Name Global Information Systems Technology Pvt Ltd
Distributor Address 877, Udhyog Vihar, Phase-V, Gurgaon
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 658.2 PET
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Peters, Ralph W.
245 ## - TITLE STATEMENT
Title Reliable maintenance planning, estimating, and scheduling /
Statement of responsibility, etc Ralph W. Peters.
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Place of publication, distribution, etc Amsterdam ;
Name of publisher, distributor, etc Gulf Professional Publishing,
Date of publication, distribution, etc ©2014
300 ## - PHYSICAL DESCRIPTION
Extent xii, 505 pages :
Other physical details illustrations ;
Dimensions 23 cm.
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note 1 - Profit and Customer-Centered Benefits of Planning and Scheduling,
Uniform Resource Identifier http://www.sciencedirect.com/science/article/pii/B9780123970428000012
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note 2 - Defining Results to Top Leaders and Operations Leaders,
Uniform Resource Identifier http://www.sciencedirect.com/science/article/pii/B9780123970428000024
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note 3 - Leadership: Creating Maintenance Leaders,
Uniform Resource Identifier http://www.sciencedirect.com/science/article/pii/B9780123970428000036
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note 4 - How to Create PRIDE in Maintenance within Craft Leaders and the Technical Workforce,
Uniform Resource Identifier http://www.sciencedirect.com/science/article/pii/B9780123970428000048
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note 5 - Define Your Physical Asset Management Strategy with The Scoreboard for Maintenance Excellence and Go Beyond ISO 55000,
Uniform Resource Identifier http://www.sciencedirect.com/science/article/pii/B978012397042800005X
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note Chapter 6 - Planners Must Understand Productivity and How Reliable Maintenance Planning, Estimating and Scheduling (RMPES) Enhances Total Operations Excellence,
Uniform Resource Identifier http://www.sciencedirect.com/science/article/pii/B9780123970428000061
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note 7 - What to Look for When Hiring a Reliable Planner/Scheduler,
Uniform Resource Identifier http://www.sciencedirect.com/science/article/pii/B9780123970428000073
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note 8 - Planner Review of the Maintenance Business System—Your CMMS-EAM System,
Uniform Resource Identifier http://www.sciencedirect.com/science/article/pii/B9780123970428000085
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note 9 - Defining Maintenance Strategies for Critical Equipment With Reliability-Centered Maintenance (RCM),
Uniform Resource Identifier http://www.sciencedirect.com/science/article/pii/B9780123970428000097
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note 10 - Defining Total Maintenance Requirements and Backlog,
Uniform Resource Identifier http://www.sciencedirect.com/science/article/pii/B9780123970428000103
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note 11 - Overview of a Reliable Planning-Estimating-Scheduling-Monitoring-Controlling Process, In Reliable Maintenance Planning,
Uniform Resource Identifier http://www.sciencedirect.com/science/article/pii/B9780123970428000115
Miscellaneous information 12 - Why the Work Order Is a Prime Source for Reliability Information,<br/>13 - Detailed Planning with a Reliable Scope of Work and a Complete Job Package,<br/>14 - Understanding Risk-Based Maintenance by Using Risked-Based Planning with Risk-Based Inspections,<br/>Chapter 15 - Developing Improved Repair Methods and Reliable Maintenance Planning Times with the ACE Team Process, <br/>16 - Successful Scheduling by Keeping the Promise and Completing the Schedule,<br/>17 - Maintenance, Repair, and Operations (MRO) Material Management: The Missing Link in Reliability,<br/>18 - How to Measure Total Operations Success with the Reliable Maintenance Excellence Index, <br/>19 - How This Book Can Apply to the Very Small Work Unit in Oil and Gas or to Any Type of Maintenance Operation,<br/>20 - A Model for Success: Developing Your Next Steps for Sustainable and Reliable Maintenance Planning—Estimating and Scheduling,<br/>
520 ## - SUMMARY, ETC.
Summary, etc <br/>"This book is will be like no other that I have used, read or researched. Of course, it will cover material and ground that has been plowed before by some great authors like Joel Levitt & Don Nyman, Tim Kister & Bruce Hawkins, Doc Palmer, Michael Brown and others. This one will be about reliable maintenance planning, estimating and scheduling (RMPES) within organizations having very critical and complex equipment, extreme HSSE challenges located in environmentally sensitive locations in most cases. It will cover the complete scope of planning, estimating and scheduling but include in detail added focus a planner/scheduler can have on reliability and Continuous Reliability Improvement (CRI)"
Uniform Resource Identifier http://www.sciencedirect.com/science/book/9780123970428
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Plant maintenance
Source of heading or term
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Planning.
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Management.
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Production scheduling.
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Reliable maintenance planning
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element E-Books
856 ## - ELECTRONIC LOCATION AND ACCESS
Materials specified E-Book
Uniform Resource Identifier http://www.sciencedirect.com/science/book/9780123970428
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Electronic Resources (E-Books)
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Materials specified (bound volume or other part) Damaged status Not for loan Collection code Home library Current library Date acquired Source of acquisition Cost, normal purchase price Total Checkouts Full call number Barcode Date last seen Price effective from Koha item type
    Dewey Decimal Classification Document, Internet resource   Not For Loan Reference SNU LIBRARY SNU LIBRARY 11/05/2016 Science Direct®, (Elsevier) 10500.00   658.2 PET ER33 11/05/2016 11/05/2016 Electronic Resources (E-Books)

© Copyright Shiv Nadar University 2012. All Rights Reserved.  Disclaimer |  Sitemap
The Shiv Nadar University has been established under U.P. Act No 12 of 2011. Shiv Nadar University is UGC Approved.